Case Study
Richland Parish
Data Center
Showcasing Nexterra’s Capacity
for Large-Scale Infrastructure Projects



The Richland Parish Data Center in northeast Louisiana is a high-profile, multibillion-dollar infrastructure initiative that showcases Nexterra’s ability to support large-scale construction projects through its affiliate, Jen-Hill. With a projected $10 billion investment over two phases, the development marks a major step forward in the region’s digital and economic growth.
Phase one (2023–2026) is estimated at $378 million, with phase two (2027–2030) adding another $378 million. The site demands advanced engineering and environmental strategies to transform flood-prone, undeveloped land into a secure, high-capacity operational hub.Project Details
Located on low-lying, underdeveloped land, the site required significant re-engineering to support heavy equipment, drainage systems, and data center infrastructure. Jen-Hill was tasked with developing erosion control and environmental management strategies in line with phased construction timelines.
With complex sequencing, erosion and sediment control materials had to be deployed, removed, and replaced repeatedly. These efforts involved custom seed blends, straw matting, and containment products — supported by logistics partnerships to ensure compliance and construction efficiency.
Identifying Key Issues
- Flood-prone terrain with high water tables
- Poor soil stability unsuitable for large-scale equipment
- Strict environmental regulationsrequiring adaptive erosion control
- Multi-phase constructionneeding dynamic stabilization strategies
- Limited initial site accessdelaying early operations
Innovative Solutions: Environmental & Erosion Control
Jen-Hill implemented strategic, site-specific solutions to protect the environment and keep the project on schedule:
- Custom seed applications and biodegradable matting for rapid stabilization
- Temporary sediment control systems aligned with construction sequencing
- On-demand installation through coordinated rental and contractor partnerships
- Scalable erosion measures that adapt with evolving site phases
Innovative Solutions: Infrastructure & Compliance Integration
Beyond stabilization, Jen-Hill contributed to long-term infrastructure resilience:
- Engineered drainage systems to reduce flood risk
- Reinforced roads and access points for equipment mobility
- Sustainable materials and methods to minimize environmental impact
- Integrated planning with contractors to ensure seamless compliance
The Richland Parish Data Center is a powerful example of Nexterra’s ability to manage complex, multi-year infrastructure projects. Through Jen-Hill’s integrated environmental and construction strategies, the project balances technical precision, regulatory compliance, and long-term sustainability on a massive scale.